EMERFLEX panels between metal studs, before the board lining

Installer area

Install EMERFLEX, with no unpleasant surprises

Carpenters, roofers, drywall installers: everything you need to price accurately, install quickly and get paid for your time. Free access, no registration.

What to know before you price the job

EMERFLEX is a semi-rigid panel. Compared with a roll, installing the insulation takes about 20% longer. Across the whole job, this is a small part of your quote, provided you price it in from the start. An installer who discovers this time up on the roof makes no money: an installer who priced it in does.

The right saw removes most of this gap. A utility knife is not suitable.

How to install

A semi-rigid 1200 × 600 mm panel, 60 kg/m³, that is cut with a saw and installed between rafters, between studs or between trussed rafters.

Tools

A saw, not a utility knife

Handsaw, alligator saw, portable or fixed band saw. A suitable blade removes most of the extra installation time.

Your PPE

Gloves, safety glasses and dust mask when cutting.

Storage

Can be stored outdoors, always protected from water.

On roofs

The configuration installed on successful jobs, from top to bottom.

  1. Metal sheet or tile roof covering
  2. Roofing underlay
  3. 20 mm ventilated air gap, on counter-battens
  4. EMERFLEX 62 mm between rafters, edge to edge

Key points

  • The air gap. The insulation must not touch the roofing underlay: keep the 20 mm, and keep the air gap ventilated.
  • Metal sheet fixings. They must not pierce the underlay: the counter-battens provide the necessary height.
  • Joints. Panels edge to edge, with no gaps between them or against the rafters. With two layers, stagger the joints of the second layer.
  • No vapour barrier in this configuration.
  • Inspection body. On a public building (ERP), a multi-unit housing project or a public contract, the specified configuration replaces the air gap with a synthetic felt. Ask us before ordering.

In partitions and wall linings

  1. Top and bottom metal tracks
  2. M48 studs: single up to 2.50 m high, double up to 3.05 m, in accordance with DTU 25.41
  3. Routing of electrical conduits if needed
  4. EMERFLEX 45 mm between studs, edge to edge
  5. Fixing the plasterboard

On timber frame: same steps, studs installed in accordance with DTU 31.2 and 25.41.

In unconverted lofts

  • Between trussed rafters: hangers installed in accordance with DTU 25.41, insulation between ties, clip-on furring channels, plasterboard
  • On the floor: first layer with staggered joints, second layer laid crosswise

Reference codes of practice: DTU 25.41 (plasterboard), DTU 31.2 (timber frame), DTU 20.1 (masonry).

Installer questions

How do you cut the panel?

With a saw, not a utility knife. A handsaw or alligator saw is enough, a band saw is faster for large runs.

Is a vapour barrier needed on roofs?

Not in the configuration with a ventilated air gap. On a project subject to an inspection body, the specified configuration includes a synthetic felt that acts as a vapour barrier.

What about moisture under the metal sheeting?

Under metal sheeting, everything picks up moisture: the question is what releases it. A panel ventilated over an air gap is good building practice, and that is the practice we follow.

Will the panel sag?

No. At 60 kg/m³, the semi-rigid panel stays where it was installed.

What about termites?

EMERFLEX was tested by FCBA to standard NF EN 117: all exposed termites die, the material is not palatable to them. It was also tested against wood-decay fungi (NF EN ISO 846).

A panel is damaged, what should you do?

It can be replaced panel by panel. No spray foam, no point of no return.

Which thickness for the CEE grant?

62 mm on roofs: R = 1.50 m².K/W, the threshold required for residential buildings. The 45 mm (R = 1.10) is designed for partitions and suspended ceilings.

Charging for installation

The extra time for a semi-rigid panel is priced in euros per m², not as a percentage. Priced in from the quote, it gets paid.

Price in euros, not as a percentage

The 20% extra time applies to a single task: installing the insulation. Not the roof framing, not the roof covering, not the whole job. Here is how to reflect it in your quote, with your own figures.

StepExample calculationYour figures
1. Your installation price for roll insulation€17/m²€…/m²
2. Extra time for the semi-rigid panel on this task+ 20 %+ 20 %
3. Your EMERFLEX installation price€20.40/m², i.e. €3.40/m² more€…/m²
4. On a 140 m² villa roof€476 of extra installation, to be invoiced… €

Indicative example to illustrate the method: replace each line with your own times and rates. Ask your distributor or our team for supply prices.

The standard quote line

Supply and installation of EMERFLEX 62 mm bio-based insulation, R = 1.50 m².K/W, between rafters, under roofing underlay and 20 mm ventilated air gap. Unit: m².

Full quote example, villa roof

DescriptionUnit
Removal and disposal of the old roof covering, if renovationm²
Roofing underlay, supply and installationm²
Counter-battens for 20 mm ventilated air gapm²
Supply and installation of EMERFLEX 62 mm bio-based insulation, R = 1.50 m².K/W, between raftersm²
Metal sheet roof covering, supply and installationm²

On a contract with technical specifications (CCTP), ask for or propose a separate line “installation surcharge for semi-rigid bio-based insulation, cutting and layout”, in €/m². All bidders price the same thing, nobody is penalised.

The CEE grant

On roofs, EMERFLEX 62 mm insulation is eligible for French Energy Savings Certificates (CEE) (EDF Agir Plus programme).

  • Houses, dwellings: BAR-EN-106 sheet, R ≥ 1.5 m².K/W, RGE installer.
  • Offices, shops, hotels, schools: BAT-EN-106 sheet, R ≥ 1.2 m².K/W, no RGE requirement.

For the application file, a manufacturer’s document specifying the thermal characteristics of the installed product is sufficient. We provide it on request.

Arguments for your client

  • “I don’t know it.” Other carpenters have already installed it: RENOU, TOP Rénov’, GTS.
  • “It’s new.” LNE, Ginger CEBTP and FCBA reports: the same laboratories as for wool insulation.
  • “What about moisture?” A panel ventilated over an air gap is good building practice.
  • Termites. Tested against termites and wood-decay fungi.
  • Rain on the metal roof. A panel that absorbs noise, class B.
  • Local. Made in Ducos, no container to wait for.

Get listed

EMERWALL trains and lists the professionals who install its solutions. The request takes two minutes with the form below.

How it works

01

Training

With our technical team, on your types of job: configuration, tools, cutting, key points.

02

A first supported job

We remain available during installation. You take a few photos as the job progresses.

03

Listing

Your company appears in the list of approved installers in your territory.

What listing gives you

Visibility

Your company is featured on emerwall.eu, in the list for your territory.

Installation requests

Requests from private individuals and project owners in your area are passed on to you.

CEE file

The manufacturer’s document on thermal characteristics, for your client’s grant application.

Direct line

Direct access to our technical team and to the installation documents.

Request training or listing

Carpenter, roofer, drywall installer: tell us who you are and what you install. We will get back to you to schedule the training, then the listing on emerwall.eu.

    Your request *

    Have you already installed EMERFLEX?

    Are you RGE certified?

    Our partner installers

    Companies that know EMERFLEX and have already installed it. Hover over a card (or tap it) for their contact details. Do you install EMERFLEX and want to be listed here? Request the training and listing.

    Partitions, wall linings, suspended ceilings

    Roofing and roof framing

    Martinique

    AOMCC

    Steel roof framing, roofing

    Terres Sainville, 5 rue Alexandre Trissot
    97200 Fort-de-France

    Mon to Thu, 8am to 12pm and 1pm to 5pm
    Fri, 8am to 2pm

    Guadeloupe

    G3C

    Timber roof framing, roofing, timber frame

    4 lotissement Caraïbe, ZAC de Moudong Centre
    97122 Baie-Mahault

    Mon to Fri, 7am to 5pm

    They have installed it

    Carpenters, roofers and drywall installers who already install EMERFLEX in Martinique and Guadeloupe.

    They install EMERFLEX

    CompanyTradeProjects
    AOMCCRoof framing and metal roofingRoof of an OZANAM multi-unit housing programme in Balata, 501 m², 2025
    SAS ARROJOBuilder, Tiny Creole HouseRoofs of three houses, 2025
    RENOU CharpenteRoof framingVilla roofs with exposed framing, since 2024
    TOP Rénov’ AntillesRenovationRoofs and partitions, since 2024
    Gouttière Service (GTS)RoofingRoofs, since 2024
    PLAFODECOPlasteringPartitions for 42 SIKOA dwellings in Dugazon (Guadeloupe), over 1,000 m², 2025
    CAA AgencementInterior fit-outPartitions for a Crédit Mutuel branch, 386 m², 2025

    Stuck on an installation?

    Call our technical team, even for a small question. That’s what it’s there for.

    0696 67 62 57 · contact@emerwall.eu

    A job to price?

    Send us the area and configuration: we will help you choose the right thickness and system.